The installation of solar energy systems

Published:2013-06-17

The installation of solar energy systems

Solar photovoltaic every part with each other. Any problems will be a place for the use of solar lighting have an enormous impact. Battery room should be ventilated, dry and clean. Here are some solar battery installation technical requirements.

Installation is best to use a compass to determine direction and should be taken in the square before the day can not have tall buildings or trees, etc., so as not to cover the sun; carefully check the ground screw and square brackets, etc. is solid and reliable, all screw terminals etc. should be tightened, not loose; sun exposure while taking care not to install the components of positive and negative, in order to avoid electric shock. Opaque material used when necessary wiring or installation covered before.

Solar battery installation instructions:

1) Install installation task instructions received by the personnel ready relevant information (such as factory battery installed, record sheets, etc.) and battery installation tools (including multimeters, etc.) to implement the project start date and the progress of projects.
    
2) Installation personnel shall carry a small amount of system spare parts (such as screws, etc.) arrived at the installation site for detailed installation schedule, to discuss details of the project (such as installation, loading, etc.).
    
3) before you begin installation, installation personnel training should be organized to introduce precautions during installation and battery use and maintenance considerations, the installation process must pay attention to safety.
      
4) Install the battery box inspection personnel and accessories inventory, packing list, please sign and receive supervisory staff.

5) During installation, because the battery is charged, pay attention to prevent short circuits, all must wrap insulating tape installation tool.
    
6) Install connecting bar should be preceded with a clean linen wipe the battery casing and steel pole and the dust, in particular to ensure that the very pillars of dust wipe clean. Monomer number to be affixed securely.

7) After installation to individually check all screws are tight. To designate a person check, the person responsible for ensuring that all screws are tightened state.
      
8) batteries and switching power connections, should carefully check the power switch is set correctly (see Switching power setting parameter table), ensure that the settings are correct.
    
9) After the installation check, measure and record all the open circuit voltage of the battery cell and the total voltage of the battery pack and fill install tables (or other similar mounting table).